Talk to our engineering team
Send your duty parameters and we reply with a drawing and a price within 72 hours.
@
Emailalina@cheegers.com & alina@cheegers.cn
T
Phone / WhatsApp / WeChat+86 13378114702
A
Factory addressChengdu Longtan Industrial Park, No.68 Chenghong Street, Chengdu, Sichuan, China 610000
H
Working hoursMonday to Saturday, 08:30 – 18:00 (GMT+8)
What to include in your enquiry
Lead time: rotary airlock valves 45–50 days; diverter valves 25–30 days.
- Material handled, bulk density and temperature
- Required capacity in t/h, and the pipe or duct size
- Working pressure or vacuum at the valve
- Body material preference (cast iron, 304 or 316L stainless steel)
- Drive preference: gear motor, chain drive or direct coupling
If you are not sure about any of these, send the application description and a photo of the installation point — we will work out the rest.
Send us your enquiry